News

Robbins TBM to provide bearings for SLBC project

HYDERABAD: After a meeting with Roads & Buildings Minister Komatireddy Venkat Reddy, Robbins Tunnel Boring Machines Manufacturing Company agreed to provide main bearings and other spare parts for completion of Srisailam Left Bank Canal (SLBC) project.

The minister visited the company in Ohio, US on Monday and discussed the SLBC tunnel project. Robbins Group EO Lok Home demonstrated the advanced construction machinery used for tunnel excavation to the minister.

During his visit, Venkat Reddt asked Lok Home to provide bearings and other cutting spare parts as soon as possible for tunnel excavation in SLBC project.

Venkat Reddy assured that the government will make payment within 40 days through green channel. After the discussions with the minister, the Robbins Group agreed to provide the required bearings and other spare parts.

हिंदी की ताजा खबरें पढने के लिए यहाँ क्लिक करें|

Related Articles

Back to top button
हिंदी की ताजा खबर पढने के लिए यहाँ क्लिक करें|
Bhumi Pednekar’s desi avatar seen Rakul Preet Singh’s bold avatar set the internet on fire Latest Photoshoot of Rachel David Check out the latest photos of Shriya Saran for Hello Mag India awards Rakul Preet Singh Sizzles in Purple Saree Sizzling Photoshoot of Raai Laxmi Glamorous Stills of Huma Qureshi Nora Fatehi Flaunts her Sexy Figure in Transparent Gown Vacation Photos of Chetna Pande Enjoying in her own Style Latest Photoshoot of Samyuktha Menon in White Saree