News
Operation of 35 express trains will be affected in Chhattisgarh
Raipur. Electronic interlocking work will be done to connect the third line between Rajnandgaon-Kalmana railway section of South East Central Railway Nagpur Railway Division with Amgaon railway station. In this electronic interlocking work, pre-non interlocking work will be done from 07 to 10 October, 2023 and non-interlocking work will be done from 11 to 14 October, 2023. As a result of this work, some trains will be canceled and some will be terminated and sent before the destination, the information of which is as follows: –