News

GHMC said- drain desilting work on track

Hyderabad: The Greater Hyderabad Municipal Corporation (GHMC) said that the desilting work of 53.96 km of the 171.25 km long drain flowing through Khairatabad area has been completed.

Regarding desilting of Balakpur Nala, which was recently inspected by M. Dana Kishore, Principal Secretary, MA&UD, a length of 4 km out of the total 9.64 km has already been desilted, a GHMC press release here on Wednesday said. The silt has been removed.

हिंदी की ताजा खबरें पढने के लिए यहाँ क्लिक करें|

Related Articles

Back to top button
हिंदी की ताजा खबर पढने के लिए यहाँ क्लिक करें|
Bhumi Pednekar’s desi avatar seen Rakul Preet Singh’s bold avatar set the internet on fire Latest Photoshoot of Rachel David Check out the latest photos of Shriya Saran for Hello Mag India awards Rakul Preet Singh Sizzles in Purple Saree Sizzling Photoshoot of Raai Laxmi Glamorous Stills of Huma Qureshi Nora Fatehi Flaunts her Sexy Figure in Transparent Gown Vacation Photos of Chetna Pande Enjoying in her own Style Latest Photoshoot of Samyuktha Menon in White Saree