News
Level crossing gate Urla including human being closed from 31st October
Raipur. Level crossing gate number 436 (Urla gate) with manned km. 844/20 and Gate No. 438 (D-Cabin Gate) Km. The construction work of Road Under Bridge (RUB) in place of 846/28 has been completed by the Railways. After the construction of Road Under Bridge (RUB) by the then District Magistrate, Durg, Gate no. 436 (Urla) and gate no. Consent was given to permanently close 438. Therefore, keeping in mind the safety of road traffic and rail traffic, gate no. 436 (Urla Gate) and Gate No. 438 (D-Cabin Gate) by Railways dated 31.10. It was ensured to open the Road Under Bridge (RUB) for road traffic by permanently closing it by 2023.