News

Patna-Ranchi Vande Bharat Successfully Completes Third Trial Run

Ranchi Vande Bharat Express on Sunday successfully completed the third trial run, an official said. The commercial operation of the semi-high-speed train will start on June 28, the official said.

Birendra Kumar, Chief Public Relation Officer (CPRO) of East Central Railway (ECR), Hajipur zone, said that the final and third trial run of the Express with eight coaches was done successfully from Patna to Ranchi. “It is now fit for inauguration on June 27 and commercial operation from June 28,” Kumar said.

The train, which started from Patna junction around 7 am, reached Ranchi around 12.50 pm. It left for the Bihar capital in the afternoon. The first successful trial run was conducted from Patna to Ranchi and back on June 12, while the second trial run was held on June 18.

The 27-km stretch between Sidhwar (Ramgarh) and Sanki (Ranchi) has four tunnels, the longest being 1.7-km-long, while three others are around 600 metres each. The commissioner of railway safety (CRS) in Kolkata had conducted a safety inspection and speed trial on the 27-km stretch between Sidhwar and Sanki and had given its nod to operationalise the new route between Koderma and Ranchi via Barkakana in December last.

हिंदी की ताजा खबरें पढने के लिए यहाँ क्लिक करें|

Related Articles

Back to top button
हिंदी की ताजा खबर पढने के लिए यहाँ क्लिक करें|
Bhumi Pednekar’s desi avatar seen Rakul Preet Singh’s bold avatar set the internet on fire Latest Photoshoot of Rachel David Check out the latest photos of Shriya Saran for Hello Mag India awards Rakul Preet Singh Sizzles in Purple Saree Sizzling Photoshoot of Raai Laxmi Glamorous Stills of Huma Qureshi Nora Fatehi Flaunts her Sexy Figure in Transparent Gown Vacation Photos of Chetna Pande Enjoying in her own Style Latest Photoshoot of Samyuktha Menon in White Saree