News

Hyderabad: Musi project close to full capacity after heavy rains

Hyderabad: The Musi Project is nearing full capacity as heavy rains have significantly increased the inflows.

At 6 p.m. on Monday, the recorded water level stood at 643.35 ft, close to the Full Tank Level (FTL) of 645 ft. The reservoir’s capacity is 4.46 TMC, and with the current inflows, the present storage has reached 4.03 TMC.

The total outflow from the Musi Project is 15,643.17 cusecs, with 15,442.28 cusecs being released through eight floodgates, each lifted by 3 feet.

हिंदी की ताजा खबरें पढने के लिए यहाँ क्लिक करें|

Related Articles

Back to top button
हिंदी की ताजा खबर पढने के लिए यहाँ क्लिक करें|
Bhumi Pednekar’s desi avatar seen Rakul Preet Singh’s bold avatar set the internet on fire Latest Photoshoot of Rachel David Check out the latest photos of Shriya Saran for Hello Mag India awards Rakul Preet Singh Sizzles in Purple Saree Sizzling Photoshoot of Raai Laxmi Glamorous Stills of Huma Qureshi Nora Fatehi Flaunts her Sexy Figure in Transparent Gown Vacation Photos of Chetna Pande Enjoying in her own Style Latest Photoshoot of Samyuktha Menon in White Saree